1. Endorsed by the MALAYSIA BOOK OF RECORDS for
‘The Longest Free Span Single Rope Cable Car – Total In Length – 919.5 meter’
One of the Steepest Gradient in the World – 42 degree
2. PRIX ACIER AWARDS 2005
‘Outstanding construction, architectural quality & technical proficiency of steel works’
‘Outstanding construction, architectural quality & technical proficiency of steel works’
3. FOOTBRIDGE AWARDS 2005
‘Winner for Technology LONGEST SPAN’
‘Winner for Technology LONGEST SPAN’
OPERATING HOURS
| Monday – Thursday | 10.00am - 18.00pm |
| Wednesday | 12.00pm - 18.00pm |
| Friday – Sunday & Public Holiday | 09.30am - 19.00pm |
HANGING BRIDGE – The Facts
| • Overall Distance | 125 m |
| • Pylon Height | 82 m |
| • Pylon foundation above sea-level | 605 m |
| • Top of Pylon above sea-level | 687 m |
| • Loading / Maximum Capacity | 2000 pax @ 4 person per m2 |
| • Square Area | 500m2 |
| • Construction Period (Aug 2003 – Aug 2004) | 12 months |
| • Open to public | 27 Feb 2005 |
CABLE CAR SYSTEM FOR GUNUNG MACHINCANG
| • Horizontal distance | 2079 m |
| • Vertical rise | 680 m |
| • Inclined distance | 2158 m |
| • Haul rope diameter | 50 mm |
| • Bull wheel diameter | 6.10 m |
| • Passengers per-gondola | 6 persons |
| • Design speed | 5 m/sec |
| • Operating speed | 3 m/sec |
| • Turn around trip time | 28 mins |
| • Hourly capacity | 700 pax/hour |
| • Numbers of stations | 3 |
| • Numbers of ‘On-line Towers’ | 2 |
| • Height of Tower 1 (nearest to Base Station) | 38 m |
| • Height of Tower 2 | 70 m |
| • Longest free span (between Tower 2 and Middle Station) | 950 m |
| • Steepest gradient | 42 degrees |
| • Construction period (April 2001 – August 2002) | 16 months |
| • Testing & commissioning period (August – October ’02) | 3 months |
| • Open to public (Free ride) – October 2002 | 1 months |
| • Revenue collection commencing – (November ’02) | to-date |